murphyoilcorp.com
Search
MUR:  58.38   [Up 1.20 3:01 PM]    September 10, 2010  Volume: 994547   Low: 57.48   High: 58.60    

Enterprise: No Gasoline Loading at Princeton Terminal Sun.
9/10 8:12 AM
Enterprise: No Gasoline Loading at Princeton Terminal Sun. OAKHURST, N.J. (DTN) --- The Enterprise Refined Products Co. today said in a bulletin that its Princeton Conventional Truck Loading Rack in Oakland, Indiana, will be shut down for nine hours on Sunday. The rack, which will be down from 8:00 AM CT to 5:00 PM CT, will be down for all gasoline loading due to maintenance. Enterprise said the rack will be able to load diesel during the shutdown. Enterprise Products Partners acquired TEPPCO's midstream network in late October 2009. The network is comprised of approximately 12,500 miles of pipelines that gather and transport refined petroleum products, crude oil, natural gas, liquefied petroleum gases, and natural gas liquids and includes one of the largest common carrier pipelines for refined petroleum products and LPGs in the U.S. (c) 2010 Telvent DTN. All rights reserved.
 
Copyright DTN. All rights reserved. Disclaimer.
Powered By DTN